Alpine Tunnel

Excavation of the Alpine Tunnel began in January 1880. At an altitude of 11,523 feet, it became the first tunnel constructed through the Continental Divide, and was expected to be finished in only six months. However, due to unforeseen circumstances and construction taking place in the dead of winter, the task required nearly two years to complete. Fractured granite necessitated the expense of using over 400,000 board feet of California redwood to support and encase 1,427 feet of the 1,772 foot long tunnel with a total cost of around $300,000.

The first train went through the Alpine Tunnel began in July of 1882 with the last one through in November of 1910. During its thirty-year life, the Alpine tunneled bristled with activity carrying freight for the many mining camps in the area, and tourists.  One extraordinary site is the retaining wall knows as the “Palisades.” Constructed of hand-cut stones without the use of mortar, the retaining wall is 432 feet in length and 33 feet in height. A longer retaining wall is just below this wall, but is only six feet in height.  A huge stone engine repair house that could house six engines was gutted by fire in early 1906. The remains of the engine house can still be viewed today. Efforts to save the Alpine Station are underway. Francis B. Trudgeon saved the old depot by making extensive repairs and the installation of a new roof in 1959.

Read More

Titan I missile silos near Denver, CO

451st Strategic Missile Wing Lowry AFB, Colorado

On March 13, 1958, the Air Force Ballistic Committee approved the selection of Lowry AFB to be the first Titan I ICBM base. Construction of launchers and support facilities began on May 1, 1959 located on the bombing range east of Denver. This was conveniently close to the Titan I’s manufacturer, the Martin Company (now Lockheed Martin) located in Littleton, Colorado.

Deployment of the missiles entailed a 3 x 3 configuration, meaning each of the three complexes had three silos grouped in close proximity to a manned launch control facility. The Omaha District of the Army Corps of Engineers contracted a joint venture led by Morrison-Knudsen of Boise, Idaho, to construct the silos. 144-day steel strike in 1959 caused delays and forced Morrison-Knudsen to resort to winter concreting. Despite this problem and others caused by constant design modifications, Morrison-Knudsen completed the project on time with the lowest construction costs of any ICBM base in the country at the time. Fairly smooth management-labor relations contributed to the success. The project also maintained the best safety record in the missile construction program up until that time. Use of a safety net was credited with saving many lives. Three workers did die during the project, although one of these deaths was the result of a motor vehicle accident that occurred off site. 